top of page
Coffey-7.jpg
Search

Steel-Frame Barndominium vs. Traditional Pole Barn: Mooresville Comparison

  • Matt Johnson
  • Jul 18
  • 1 min read

Updated: Aug 28


If you’re dreaming of open-concept living with ample workshop space, both steel-frame barndominiums and pole barns deliver, yet only one thrives in Mooresville’s humid climate.


1. Structural Integrity

  • Steel-frame – 50 ksi structural steel resists termites, rot and warp.

  • Pole barn – Pressure-treated posts wick ground moisture and can decay.

2. Energy Efficiency

Continuous exterior insulation on steel framing achieves R-26 walls; pole barns rely on cavity insulation only.

3. Speed to Dry-In

Pre-engineered steel kits erect in 7–10 days. Pole-barn framing averages three weeks.

4. Cost Comparison (2 400 sq ft shell)

System

Shell Cost

10-Year Maintenance

Steel-frame

$85–$95 / sq ft

Repaint every 20 yrs

Pole barn

$70–$80 / sq ft

Replace posts & skirt boards

Internal link: steel-frame barndominium.


5. Aesthetic Flexibility

Steel frames accept brick, board-and-batten or modern metal rainscreens. Pole barns typically limit you to metal siding.


Johnson Building’s Steel Advantage

  • Bolt-together frames reduce on-site welding.

  • Custom architectural facades designed in-house.

  • SCIF-grade vapor barriers tame Carolina humidity.


FAQ

Can I add a second story later? Yes, steel clear-spans support mezzanine retrofits. 

Are insurance rates lower? Many carriers discount non-combustible frames 5-15 %.


Thinking Steel?

Book a free consultation to price a Mooresville steel-frame barndominium.


 
 
 

Comments


JB leadmagnet.png

Get Your Free Barndominium & Custom-Home Cost Guide

Let’s Build Your
Vision Together

Ready to get started? Or just have questions?

Please reach out to us through this form, and we’ll be in touch shortly.

bottom of page